The Town of Innisfil takes on construction and capital projects to build new assets or complete repairs or replacement of existing assets. We recognize that we can’t do it alone, which is why we try to involve Innisfil residents as much as possible.
Featured projects

Paving Projects
Summary of our annual road paving projects, as outlined by the Roads Needs Study.

Innisfil Beach Park
Phase 1 of park improvements is underway, bringing beach upgrades, pickleball and tennis courts, new toddler play equipment, a new washroom, and more.

Killarney Beach Road
Road improvements to Killarney Beach Road began in 2025 and are scheduled to conclude in 2026.

Alcona Sanitary Sewer and Drainage
A new trunk sanitary sewer and drainage work within the project area, including culvert crossings, ditching, regrading, and outlet improvements.
Infrastructure projects
Browse ways to stay informed or make your mark on projects below. You can search by name, status, or type.

Type: Roads, Sidewalks and Trails
The Schedule ‘A' Municipal Class Environmental Assessment (Class EA) study was completed. Construction of the trail was completed in 2022.

Status: In progress
Type: Roads, Sidewalks and Trails
The Class Environmental Study Update and Transportation Environmental Study Report addendum were completed by the Ministry of Transportation (MTO) in 2017. Construction began in 2022.

Status: Upcoming
Type: Roads, Sidewalks and Trails
The Town of Innisfil and the Ministry of Transportation began a Municipal Class EA Review in 2023.

Status: In progress
Type: Drainage and Stormwater
Improvements are underway for the South Innisfil Creek Drain.

Status: In progress
Type: Drainage and Stormwater
Final approval of the Engineer's Report was given in 2024. Tendering and construction in undertaken by the County of Simcoe.

Status: In progress
Type: Roads, Sidewalks and Trails
Construction is scheduled to begin in 2025 to extend the current north limit of Webster Boulevard to 20th Sideroad.

Status: In progress
Type: Drainage and Stormwater
A pilot project to assess advanced sedimentation technologies in the Sleeping Lion Subdivision.

Status: In progress
Type: Parks
Phase 1 construction began in 2025 and is scheduled to be completed in 2026. Phase 1 improvements include beach upgrades, pickleball and tennis courts, new washrooms, new park exit, and more.

Status: In progress
Type: Roads, Sidewalks and Trails
Construction from Big Bay Point Road to Mapleview Drive to begin in 2026.

Status: In progress
Type: Roads, Sidewalks and Trails
Summary of our annual road paving projects, as outlined by the Roads Needs Study.