Infrastructure Projects

Infrastructure Projects

The Town of Innisfil takes on construction and capital projects to build new assets or complete repairs or replacement of existing assets. We recognize that we can’t do it alone, which is why we try to involve Innisfil residents as much as possible. 

Featured projects

Paving Projects

Summary of our annual road paving projects, as outlined by the Roads Needs Study.

Innisfil Beach Park

Phase 1 of park improvements is underway, bringing beach upgrades, pickleball and tennis courts, a new washroom, and more.

Killarney Beach Road

Road improvements to Killarney Beach Road began in 2025 and are scheduled to conclude in 2026.

Alcona Sanitary Sewer and Drainage

A new trunk sanitary sewer and drainage work within the project area, including culvert crossings, ditching, regrading, and outlet improvements.

Infrastructure projects

Browse ways to stay informed or make your mark on projects below. You can search by name, status, or type.

Small creek across a natural landscape with golden rods in the forefront and trees in the background
Status: Complete
Type: Drainage and Stormwater
Construction is now complete! Visit the South Innisfil Creek Drain project page to read more about the improvements.
Accessible splash pad with colourful water play features, including spray loops and a tipping bucket, beside a playground in a residential neighbourhood.
Status: Complete
Type: Parks
The new Margaretta Park opened in the summer of 2026, featuring Innisfil's first enhanced wheelchair accessible playground!
Three ducks resting on a log in a nice wetland area
Status: Complete
Type: Drainage and Stormwater
We partnered with the Lake Simcoe Regional Conservation Authority to construct a wetland to enhance the natural heritage system and improve drainage at Circle Park in Gilford.
"Road work ahead" road sign
Status: In progress
Type: Roads, Sidewalks and Trails
Construction from Big Bay Point Road to Mapleview Drive to begin in 2026.
Modern children's playground with slides, swings, and other elements with a suburban neighbourhood in the background
Status: Complete
Type: Parks
In 2024, this park received new playground equipment, improved trails, a shade structure, and more.
Intersection of 7th Line and Yonge Street
Status: In progress
Type: Roads, Sidewalks and Trails
Improvements to 7th Line from Yonge Street to 10th Sideroad are complete. Improvements from 20th Sideroad to Lake Simcoe are scheduled to begin in 2027.