Getting residents around the Town of Innisfil as safely and quickly as possible is one of our number one priorities. We know that our transportation network needs to be continuously maintained to make this happen, which is why we undertake projects that connect and improve our roads, sidewalks, trails.
Road paving projects
As part of the Town of Innisfil's paving program, we complete paving projects each year. We choose the selected sections of road based on the results of our Roads Needs Study, which is completed every 5 years. This study evaluates the roadway condition and rates each road section. By programming the repair of roads, we can keep maintenance costs down as opposed to leaving the roads to deteriorate and require costly reconstruction instead of resurfacing.
Design is currently underway, with the construction to be awarded in 2026, for the following roads. Please note that exact timing is subject to change based on weather, contractor availability, and budget.
Alcona area:
6th Line (County Road 27 to 5th Sideroad)
Innisfil Beach Road from 20th Sideroad east to Ferguson Street
James Street from 25th Sideroad to the road end
Kildare Avenue
Webster Boulevard from 50 m south of Blackmore Street to Fox Hill Street
Willard Avenue from Leslie Drive to Innisfil Beach Road, including the paved shoulder
Big Bay Point area:
Guest Road including pavement markings that indicate a shared lane for bicyclists and motorists
Cookstown:
11th Line from the Township of Essa boundary to Highway 89
15th Line from approximately 370 m west of Victoria Street West to the Town of Innisfil boundary at 4685 15th Line (approximately 700 m)
Victoria Street West from Empress Lane to County Road 27
Gilford area:
Fennell Drive
Hughes Drive including relocation of catch basins from front yards to the roadway
Lefroy/Belle Ewart area:
Alfred Street from Chapman Street to May Street
Barry Avenue from Killarney Beach Road to Cumberland Street
Carson Avenue from Killarney Beach Road to Lorne Avenue
Corner Avenue from Killarney Beach Road to Squire Street
Ferrier Avenue from Killarney Beach Road to road end
Frederick Street from Chapman Street to Claver Avenue (currently a gravel road)
Harbour Street from Stoney Point Road to Killarney Beach Road
Lorne Avenue from Corner Avenue to Ferrier Avenue
Squire Street from Corner Avenue to Ferrier Avenue
Walter Street from Corner Avenue to the road end (currently a gravel road)
Wisker Avenue from Isabella Street to Cumberland Street
Work is planned for the following roads in 2025:
4th Line from 10th Sideroad to Sloan Circle
7th Line from Yonge Street to 20th Sideroad
9th Line from County Road 27 to the turnaround at Highway 400 resurfacing
20th Sideroad from 9th Line to Big Bay Point resurfacing and addition of 1.5 m paved shoulders (work began in 2024)
Aspen Street from Beach Avenue to Cove Avenue
Beach Avenue from Pinegrove Avenue to Mapleview Drive
Chapman Street from Ewart Street to Lake Simcoe
Cove Avenue from Pinegrove Avenue to Mapleview Drive
Industrial Park Road from Innisfil Beach Road to approximately 1.7 km north resurfacing
Pinegrove Avenue from 25th Sideroad to Cove Avenue
Trinity Street from 25th Sideroad to road end
What to expect during construction
When road construction happens, residents can typically expect:
Working hours between 7:00 a.m. and 7:00 p.m. with some work required on Saturdays
Traffic disruptions and detour routes
Temporary disturbances during driveway culvert replacement and restoration if required
Loud noise and dust
Advance notice of construction activities and instructions on where to park