The Town of Innisfil is excited to announce that we're transforming Innisfil Beach Park into a more accessible, welcoming, and modern waterfront destination for everyone to enjoy through phased park improvements. These improvements will modernize aging amenities, ease traffic congestion, and introduce exciting new features in underused areas of the park.

View renderings of the planned changes

Timeline

Park improvements will be done in three phases. Each phase will start with a proposed design stage and be followed by construction.

Phase 1

  • Proposed design: Complete
  • Construction: In progress

Park improvements:

  • New park exit: A new exit road at 25th Sideroad with a two-metre off-road trail for walking and cycling
  • Washroom Pavilion: Replacing the old trailer washroom near the existing playground with a modern facility that exceeds Accessibility for Ontarians with Disabilities Act (AODA) standards and includes outdoor showers
  • Playground and courts: New natural toddler playground and two new volleyball courts
  • Pickleball and tennis courts: Four tennis courts and six pickleball courts (originally planned as part of Phase 2 improvements, but moved up with direction from Council following Staff Report DSR-067-25)
  • Turning circle: New pick-up/drop-off area beside the new washroom pavilion
  • Infrastructure upgrades: Water and sanitary servicing for future amenities
  • Drainage enhancements: Low Impact Development (LID) drainage swales, culvert replacement, and improved stormwater outlets
  • Beach enhancements: Expansion of beaches and accessible pathways
  • Seating and trail improvements: New park benches, bike racks, pedestrian bridges, etc.
Image
Rendering of a beach with a nearby walkway and seating at Innisfil Beach Park

Image
Rendering of a walkway with pollinator garden, trees, seating, and playgrounds nearby

Phase 2

  • Proposed design: 2028-2029
  • Construction: 2029-2030

Phase 3

  • Proposed design: 2033-2034
  • Construction: 2035-2036

Community engagement

Innisfil community members were able to provide their feedback and insights through surveys, open houses, and more as we developed the Innisfil Beach Park Master Plan. Additional consultation occurred in 2022 to inform the park concept selection.

Visit the project page